House Renovation

3rd December 2011

Sitting Room Decoration

Click here

for images

 

23rd November 2011

Update

Click here

for images

 

5th October 2011

Stairs

Click here

for images

 

13th September 2011

Painted ceilings

Click here

for images

 

31st July 2011

Front garden

Click here

for images

 

25th July 2011

Attic

Click here

for images

 

12th June 2011

Front door

Click here

for images

 

4th June 2011

Front door

Click here

for images

 

14th May 2011

Front garden and hall

Click here

for images

 

20th December 2010

The Big Freeze...then HEAT, blessed heat!

Click here

for images

 

10th October 2010

Kitchen update

 

5th October 2010

Update and upstairs

Click here

for images

 

20th August 2010

Kitchen fit

Click here

for images

 

20th July 2010

Plumbing

Click here

for images

 

15th July 2010

Attic shenanigans

Click here

for images

 

12th July 2010

Testing bath position

Click here

for images

 

10th July 2010

Upstairs (1st floor) is taking shape - walls and ceilings are up and boarded on one side. Just got to figure out how to lay out the bathroom now...

Click here

for images

 

8th July 2010

Full frames for bedroom 3 and the new bathroom completed. Full scaffolding installed, roof tiles on the extension removed, underlying reeds and lime mortar removed, roof underfelted with a breathable membrane and battened ready to be re-tiled and flashed tomorrow hopefully. New ceiling joists installed (side to side) and some patching of roof rafters. Electricians cut in sockets and 5 amp places in several rooms.

House wasn't exactly clean and tidy before, but at least it wasn't suffocating under a layer of soot. Now, there is the requisite layer of soot over every surface throughout the house, plus a layer of straw about 30 cm deep strewn across all of the first floor of the rear extension. Lovely. Had to be on site with Lili'i to make decisions on socket locations etc, and to take delivery of the bathroom suite, but slightly peturbed to look down at the sleeping babe in my arms and see her face covered in black specks.

Click here

for images from today

 

6th July 2010

First floor rear extension stud walls and ceiling joists installed today

 

5th July 2010

Last part of the kitchen ceiling removed and re-installed. Rubble cleared out. Skips starting to be filled. New bathroom walls framed and king pins installed (to take load of rood purlin). The original bathroom and bedroom 3 positions will be swapped in the new layout.

Pretty impressed to find that after six skips, people have been taking things out, not putting even a single thing in!

Click here

for images

 

2nd July 2010

Pantry wall, 1st floor chimney breast, bathroom wall and loo walls are dropped and the remaining ceiling / floor is removed. Kitchen/breakfast room wall and chimney breast are dropped. Electricians continue with first fix, installing wiring for overhead lights throughout the main part of the house.

Click here

for images

 

30th June 2010

Builder removed 2/3 of the ground floor ceiling / 1st floor floor. Joists previously ran front to back and were quite flimsy - now run side to side and are beefed up a little, with two king joists giving greater structural stability to all the walls and spreading the load evenly. Acrow props hold up the ceiling and the roof. 1st floor cupboard wall is dropped. Plumber removes hot water tank, boiler and the only radiator the house had...

Click here

for images

 

28th June 2010

Moved the temporary/2nd kitchen to the dining room. Builder removed shelves and cupboards, the wall between the 1st floor landing and bedroom 3 and their ceilings. Electricians started by installing the arteries for the rings on each floor. Builder removed plaster from the walls to be dropped, installed a platform and removed a chimney stack.

Click here

for images

 

27th June 2010

Putting up insulation in the sloped ceilings (the tiles are currently underlain by reeds fixed in place by lime mortar, starting the loooong wallpaper stripping process (lots of it), painting the sitting room, cutting back one of the enormous fig trees and getting the kitchen cleared ready for the builder to arrive tomorrow...

Click here for images

 

14th June 2010

Rest of the ceilings brought down, starting to board out the loft rooms and landing

Click here

for images

 

5th June 2010

Pulled down most of the front room (2nd floor) and landing ceilings and walls. Discovered (as expected from our previous house) that the ceiling had been holding a few inches of fine soot and ashes, most likely used as insulation...now covering every surface throughout the rest of the house... plus me and Akel.

Click here

for images

 

2nd June 2010

The fun begins - house is cleared of furniture left behind and the smallest bedroom is removed to make an enlarged 1st floor landing / phone corner... Investigated the cracks next to the 2nd floor front dorma by pulling down the sloped ceiling and wall - discovered the vertical studs are rotated; looks like a saggy floor issue.

Click here

for images

 

29th March 2010

The day after getting the keys to our new house!

Click here

for images

 

13th March 2010

First look at the house the day after it came onto the market

Click here

for images

 